Escondido Fire Training Tower

← Back to Projects

Escondido Fire Training Tower

Escondido, CA

Size 7,200 sf
Division Buildings

Project Details

Project Story

MCE provided structural engineering services including calculations, drawings, and construction services for a six level, 7,200 square foot steel-framed fire training facility for the Escondido Fire Department. The structural framing consists of structural steel beams and columns and utilized a composite concrete deck at all levels. The lateral system used for the building is Special Steel Moment Resisting Frames. Exterior walls were framed with light gauge steel girts and a metal panel siding.
Structural engineering services, including calculations, drawings, and construction services:
  • Structural framing consists of structural steel beams and columns
  • Special Steel Moment Resisting Frames
  • Light-gauge steel girts and a metal panel siding

Project Team

Andrew Leichty

Principal

Project Metrics

Location
Escondido, CA
Size
7,200 sf
Division
Buildings
Client
WRG Fire Training Simulation Systems, Inc.

Related Expertise