Temporary Construction Bridge
Size
40' Span
Division
Non-Building Structures
Project Details
Project Story
The contractor was installing new fencing and slope stability netting at the Cougar Falls spillway across from their construction staging area. The goal was to provide an easier path for personnel and a 25,000 lb excavator to access the work zone. The design consisted of two 40 ft long steel wide flange beams, steel plate decking, and manufactured temporary guardrails.
Gallery
Gallery:
Project Team
Project Metrics
- Location
- Cougar Falls Spillway, Blue River, Oregon
- Size
- 40' Span
- Division
- Non-Building Structures