Subdivision Retaining Wall

← Back to Projects

Subdivision Retaining Wall

Camas, WA

Division Non-Building Structures
Client Centex Homes

Project Details

Project Story

The Hillshire Subdivision project entailed designing retaining walls for a 51 lot subdivision. There were a total of six retaining walls on the project: four were constructed of gravity boulder walls and two were mechanically stabilized earth “lock and load” walls. The walls were analyzed for stability for both soil loading and seismic loading. MCE conducted construction services and structural observation periodically during construction.

Project Team

Ron Vandehey

Principal

Andrew Leichty

Principal

Project Metrics

Location
Camas, WA
Division
Non-Building Structures
Client
Centex Homes