Biomass Boiler & Silo

← Back to Projects

Biomass Boiler & Silo

Grant Union High School

Size 15 ft dia, 50- ton silo | 15-ton boiler
Division Non-Building Structures

Project Details

Project Story

Miller Consulting Engineers provided the structural design services for a biomass boiler and silo installation. The structural design services included the foundation anchorage design for the 15-foot- diameter, 50-ton silo, the 15-ton biomass boiler, foundation design for related process equipment, and a foundation design for a pre-engineered metal building enclosure. The design utilized a finite element analysis of the silo base slab to accurately determine the slab depth and reinforcing requirements. The equipment and silo anchorage utilized post-installed concrete anchors to minimize installation issues and related costs.

Project Team

Paul Albertine

Principal

Michelle Juarez

Associate Engineer

Project Metrics

Location
Grant Union High School
Size
15 ft dia, 50- ton silo | 15-ton boiler
Division
Non-Building Structures