The Challenge
Lewis & Clark College's footbridge across the campus ravine had a slippery wet wood surface and was becoming unsafe. Additionally, deterioration was found in the original timber framing as it was reaching the end of its service life. The bridge's four interior supports stood in an environmental zone, on soil too weak to carry a new bridge, so any new support would have needed deep foundations inside the ravine.

Our Response
Working closely with the College, Minarik Architecture, Western Wood Structures, and Precision Construction Company, our team designed a 190-foot clear span so the new bridge needs no supports in the ravine at all, in glulam and cross-laminated timber to match the college's sustainability goals. During construction the old bridge's foundations served as temporary shoring, and the prefabricated sections were lifted into place, which cut installation time and cost.

The Outcome
The college has a safe, covered crossing between the two sides of campus, with no slippery surface, better lighting at night and the least impact on the ravine. It won SEAO's 2019 Excellence in Structural Engineering award and a 2020 WoodWorks Wood Design & Building Citation.

Gallery
Project Team
Project Metrics
- Location
- Portland, OR
- Size
- 190' Clear Span
- Division
- Non-Building Structures
Project Partners
- Project Owner our client
- Lewis & Clark College
- Architect
- Minarik Architecture
- Manufacturer
- Western Wood Structures
- General Contractor
- Precision Construction Company
Awards
- Wood Design & Building Citation WoodWorks Institute
- Excellence in Structural Engineering SEAO