200’ Guy Tower
Client
Tetra Tech Communications
Project Details
Project Story
MCE provided structural analysis of this 200 foot tri-leg tower. The analysis was performed to determine the structural adequacy of the tower to support new equipment. The analysis of this tower was reused multiple times to verify the structural integrity during multiple equipment modifications. Reuse of the three-dimensional tower computer model allowed the analysis to be performed more efficiently.
Gallery
Gallery:
Project Team
Project Metrics
- Location
- Moore Hill
- Client
- Tetra Tech Communications












































































































































